Skip to main content
Help Centre

How can we help you?

Find answers to common questions and learn how to get the most out of SigmaSlides

Featured Tutorials

Video

Creating Your First AI Template

3 min

Article

Advanced AI Prompting Techniques

5 min

Guide

Organising Your Template Library

2 min

Frequently Asked Questions

Lean Six Sigma terms in plain language

You do not need to be a specialist to follow the method. Here is what the vocabulary on this site actually means, in everyday words.

Improvement methods

Lean
A way of working that removes waste so work flows with less waiting, less rework and less effort.
Six Sigma
A data-driven approach that reduces variation, so a process produces the same good result every time.
Lean Six Sigma
Lean and Six Sigma together — remove the waste and reduce the variation at the same time.
DMAIC
The five-phase method for improving a process that already exists: Define, Measure, Analyse, Improve, Control.
DMADV
The five-phase method for designing something new: Define, Measure, Analyse, Design, Verify.
Kaizen
Japanese for "change for the better" — small, continuous improvements made by the people doing the work.
PDSA
A fast improvement cycle: plan a small change, do it, study what happened, then act — adopt it or adjust it.
5S
Five steps that keep a workplace organised: Sort, Set in order, Shine, Standardise, Sustain.
A3 problem solving
A one-page story of a problem, its root cause, the countermeasures and the result — named after A3-sized paper.
Value stream mapping
Drawing the whole flow of a process from start to finish, so waiting, rework and delays become obvious.
Gemba walk
Going to where the work actually happens to see the process first-hand, rather than reading about it.
Kanban
A visual board that limits how much work is in progress, so the team finishes work instead of starting more.
Standard work
Writing down the current best way to do a task, so everybody performs it the same way.
Poka-yoke
Mistake-proofing: a design step that makes an error impossible or immediately obvious.

Analysis tools

Root cause analysis
Finding the underlying reason a problem happens, rather than repeatedly fixing the symptom.
5 Whys
Asking "why?" again and again — usually about five times — to travel from a symptom to its root cause.
Fishbone diagram
A fish-shaped diagram that sorts possible causes into categories such as people, machine, method, material, measurement and environment.
Pareto chart
A bar chart that shows which few causes account for most of the problems, so you fix the biggest ones first.
FMEA
A structured review of what could fail, how badly it would hurt and how likely it is, so you act on the worst risks first.
SIPOC
A one-page view of a process: Suppliers, Inputs, Process, Outputs, Customers.
Control chart
A run chart with control limits that shows whether a process is stable, or whether something real has changed.
Gage R&R
A check that the measurement system itself can be trusted before you act on its numbers.
Spaghetti diagram
A map of how far people or parts travel through a workspace, used to cut wasted movement.

Measures and metrics

Voice of the customer
What customers say they need, collected directly from them rather than assumed.
Critical to quality
The few things customers genuinely care about, turned into something you can measure.
Baseline
The measured "before" number you compare your improvement against.
Cycle time and lead time
Cycle time is how long one item takes to work on; lead time is how long the customer waits from request to delivery.
Takt time
The pace you need to produce at to match customer demand: available working time divided by units needed.
Cpk
A number showing how comfortably a process fits inside the customer's limits — higher is better, and 1.33 is a common target.
DPMO
How many defects you would see in a million chances, used to express a Sigma level.
First pass yield
The share of work completed correctly the first time, with no rework.
OEE
How much of the time equipment is available, running at its proper speed and producing good output.

Belt levels

White Belt
An introduction to Lean Six Sigma ideas and vocabulary.
Yellow Belt
Team members who support improvement work and use the basic tools.
Green Belt
Practitioners who lead smaller improvement projects alongside their day job.
Black Belt
Full-time improvement leaders who run complex projects and coach Green Belts.
Master Black Belt
The most experienced level — sets improvement strategy, trains Belts and governs the project portfolio.

Still need help?

Our support team is here to help you succeed